Project Description:

  • New DBST Layer from intersection National Road No 4 to Sihanouk International Airport main entrance (1,300m).
  • Repair existing base to get 6mm carriage way and 1.5m both side (shoulder).
  • New DBST layer, pipe culvert, marking,
  • Other improvement relating to above works.  
  • Construction of 400 meter  of  the chain link fence ,
  • New excavation of 1100 meter of the canal along the Boundary Road